
Hardscaping
Stone Pathways
A path should feel obvious to walk and stay level after the first winter. That comes from base depth and setting each stone individually rather than dropping them on dirt.
What’s included
- Flagstone, steppers, and natural stone treads
- Compacted base and setting bed under every stone
- Joints filled with gravel, fines, or planted
- Grades and step risers kept comfortable
How we run the job
- 01
Lay out the route
Path walked and marked on the ground before excavation.
- 02
Excavate and base
Depth cut, base placed and compacted, setting bed screeded.
- 03
Set stone
Each piece fitted, leveled, and tapped in individually.
- 04
Joint and clean
Joints filled and the path washed down.
Stone Pathways questions
Not with proper base depth — settling comes from skipping it.
Free estimate
Tell us what you're looking at. We'll tell you what it takes.
Send photos and a few details, or call and talk to the person who will walk your property. Estimates are free and typically scheduled within 48 hours.
