

The challenge
Twenty years of manzanita and volunteer pine, no equipment access past the county road, and a survey pin nobody had seen since 2004.
The result
Buildable pad delivered a week ahead of the framer's mobilization, with the oak grove intact and a permanent access road the owner still uses.
What we did
- 01Located pins and flagged the oak grove the owner wanted preserved
- 02Cut a 12-foot access corridor from the county road to the pad location
- 03Mulched the bulk in place, grappled and hauled anything over 8 inches
- 04Ground 40+ stumps below grade and dressed the pad
More projects
Magalia, CA
Insurance Non-Renewal Reversed
View project →Chico, CA
Bare Tract Lot to Finished Backyard
View project →Forest Ranch, CA
Slope Mulched Without Losing Soil
View project →
