
The challenge
Thirty percent slope with erosion history. Conventional clearing would have washed the hillside into the neighbor's drive by January.
The result
Fuel load cut dramatically while the chip layer held the slope through a wet winter with no measurable erosion.
What we did
- 01Selected mulching in place over clear-and-haul to keep ground cover
- 02Flagged and preserved mature oaks and the riparian buffer
- 03Left a uniform 3-inch chip blanket across the worked area
More projects
Paradise, CA
Five-Acre Parcel Reclaimed for Build
View project →Magalia, CA
Insurance Non-Renewal Reversed
View project →Chico, CA
Bare Tract Lot to Finished Backyard
View project →
